Da Nang High-Tech Park (CNC) was established in October 2010, on an area of 1,129.76 hectares in two communes Hoa Lien and Hoa Ninh in Hoa Vang district with 7 functional subdivisions.
The project is located on the Da Nang – Quang Ngai highway, connecting key economic zones in the Central region such as: Chan May Economic Zone (Thua Thien – Hue province), Chu Lai Economic Zone (Quang Nam province), Dung Quat Economic Zone (Quang Ngai province).
Da Nang High-tech Park is the third multi-functional high-tech park in the country after Hoa Lac High-tech Park – Hanoi and Ho Chi Minh City High-tech Park.
Project name: Cao Da Nang Industrial Park
Location: Hoa Ninh Commune and Hoa Nhon Commune, Hoa Vang District, Da Nang City
Investor: Management Board of Da Nang Hi-Tech Park and Industrial Parks
Scale: 1,129.76 hectares
Construction start time: 2010
Operational period of the project: 50 years
Gate to Da Nang Hi-Tech Park
Da Nang High-Tech Park is located on the frontage of the Da Nang – Quang Ngai expressway, northwest of Da Nang city. The project is located in Hoa Lien commune and Hoa Ninh commune, Hoa Vang district, Da Nang city.
The project connects key economic zones in the Central region: Chan May-Lang Co Economic Zone (Thua Thien – Hue province), Chu Lai Economic Zone (Quang Nam province), Dung Quat Economic Zone (Quang Ngai province) :
The construction location has high ground, the geological foundation belongs to the metamorphic, crystalline igneous system (crystallized shale), which is convenient for infrastructure construction and does not cost much to prevent subsidence.
Image of Da Nang Hi-Tech Park location
Infrastructure of Da Nang Hi-Tech Park has been completed
Traffic system
Traffic routes in the Hi-Tech Park include:
Drainage system
Drainage in the High-Tech Park is designed according to separate drainage directions, specifically as follows:
Sewerage system
Building a completely separate drainage system to drain wastewater for Da Nang high-tech park.
In the high-tech area, there are 2 key technical infrastructure works and a waste treatment station.
Water supply system
The water supply for the Hi-Tech Park is expected to be taken from Hoa Lien Water Plant with a capacity of 240,000 m3/day. Currently, the factory is in the investment preparation phase and will be completed in 2018.
In the first phase, when Hoa Lien Water Plant has not been completed, the High-Tech Park will be temporarily supplied with water from pipeline D225 on the southern bypass of Hai Van Tunnel. Water source comes from booster pump station DT602; The pumping station has a capacity of 120 m3/h, H = 70m.
Electricity distribution system
The power supply plan for the Hi-Tech Park is to build a 110/22kV Hoa Lien station, with a capacity of 2x63MVA. It is expected that 01 63MVA transformer will be put into operation in 2015. The dual-circuit 110kV line supplying power to the station will be transitionally connected to the 110kV Hoa Khanh – Hai Van Tunnel line circuit.
Communication systems
The high-tech park will have information and communication technology infrastructure to ensure smooth communication and connection, high quality transmission lines, security, safety and network security.
Image of Da Nang Hi-Tech Park infrastructure
Da Nang Hi-Tech Park has a total area of 1,129.76 hectares with different functional areas such as:
Total area: 1,129.76ha, of which:
Planning diagram of High-tech Park
Corporate income tax incentives
Preferential land rental prices
Good preferential land rental rates for investors in Da Nang Hi-Tech Park.
Incentives on land rental
Incentives on infrastructure usage fees
Import tax incentives
Download high quality planning map file: Link
Advantage:
Easy access to a large number of young, highly skilled workforce, trained from universities, colleges, high schools and vocational schools of Da Nang City.
Da Nang City’s human resources account for about 50% of the population. In addition, the labor source also originates from some neighboring cities such as Quang Nam, Thua Thien Hue, Quang Ngai… to promise to meet the recruitment needs of investors.
The entire infrastructure of the Industrial Park has been 100% complete.
Synchronous transportation system when it only takes 30 minutes to reach Da Nang city center and important locations of the city such as international airport, Lien Chieu port, Railway Station, Bus Station, Da Nang – Quang Expressway Ngai, Da Nang – Hue Expressway, National Highway 1A, …
Defect:
Evaluating a business’s eligibility to enter a high-tech park is very difficult with strict criteria.
With a staff of many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Việt Nam Property Hub offers the following services: