Hoa Cam Industrial Park was formed and began construction in 2003 with a total planning area of phase 1: 137 hectares, by 2011 the adjusted planning area was: 136.73 hectares (according to Decision No. Planning adjustment decision No. 6357/QD-UBND dated July 28, 2011 of the People’s Committee of Da Nang city).
Hoa Cam Industrial Park has a total area of 261 hectares, divided into 2 phases:
Main gate to the industrial park
The project is located in the southwest of Da Nang city, adjacent to National Highway 14B in the East-West economic corridor. This is the industrial park with the most favorable location among the industrial parks in Da Nang.
Image of Industrial Park location
The infrastructure
Infrastructure works such as power supply systems, water supply systems, roads, communications… in Hoa Cam Industrial Park are invested and built ready to serve investment projects.
Internal transportation system
The industrial park’s internal traffic system is linked to external traffic by 4 doors in 4 directions to facilitate the movement of workers and transport of goods.
The internal traffic system is organized in a checkerboard grid, the routes are designed to intersect about 300 – 400m, taking full advantage of the efficiency of using both sides of the industrial park road.
Landscape architecture system
Landscape trees in the Industrial Park are arranged to be planted along both sides of the road (sidewalks), isolated strip areas… creating shade and general landscape for the Industrial Park, reducing environmental pollution and protecting the environment. human health.
Electricity distribution system
The power supply system is connected from Cau Do Transformer Station with a capacity of 110/35/22KV(2×25)MVA, the 22KV power network (dual circuit) will be supplied to 22/0.4KA transformer stations for each factory. , Enterprise.
Water supply system
The water supply system for the Industrial Park is taken from the water supply system of Cau Do Water Plant with a capacity of 210,000m3/day and night, on the Ø200 pipeline running along National Highway 14B.
Drainage and wastewater treatment system
Local wastewater in each factory and enterprise is treated to meet prescribed standards before being discharged into the sewer network in the Industrial Park and continues to be cleaned at the Industrial Park’s wastewater treatment station with a capacity of 4,000 m3/day. ..
Postal and telecommunications service system
The postal and telecommunications network will be established in a modern manner meeting international standards as expected to be equipped with MDF, telephone systems and high-speed internet lines installed by the postal and telecommunications industry, capable of meeting all needs. investor requirements.
Phase 1: has an area of 136.7 hectares.
Expansion phase: has an area of 13.1 hectares.
Note: The project is completing legal procedures.
Phase 2: auction underway
Download high quality detailed planning file: Link
Advantage:
Easy access to a large number of young, highly skilled workforce, trained from universities, colleges, high schools and vocational schools of Da Nang City.
Da Nang City’s human resources account for about 50% of the population. In addition, the labor source also originates from some neighboring cities such as Quang Nam, Thua Thien Hue, Quang Ngai… to promise to meet the recruitment needs of investors.
The entire infrastructure of the Industrial Park has been 100% complete.
Synchronous transportation system when it only takes 15 minutes to reach Da Nang city center and important locations of the city such as international airport, Lien Chieu port, Railway Station, Bus Station, Da Nang – Quang Expressway Ngai, Da Nang – Hue Expressway, National Highway 1A, …
The location is very close to the center of Da Nang city and has a convenient transportation system, very convenient for logistics businesses that need to rent warehouses to transship goods.
Defect:
Currently, the available land fund has run out, leaving only a few old factories for resale, but with a small area, it is very difficult for a large investor to build and develop a large-scale project.
Land rental prices are quite high, making it difficult for some investors to access projects.
With a staff of many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Việt Nam Property Hub offers the following services: