[Vung Tau] Chau Duc Industrial Park

Mục lục

Overview of Chau Duc Industrial Park project

Chau Duc Industrial Park is located in two communes: Nghia Thanh and Suoi Nghe, Chau Duc district, invested by Sonadezi Chau Duc Joint Stock Company, built in 2007 with a scale of 2,287 hectares, up to now the Industrial Park Chau Duc has been completing its technical infrastructure. At the same time, many factories in the industrial park are being quickly completed by investors to meet the needs of renting factories in Chau Duc Industrial Park in particular and demand for renting factories in Ba Ria – Vung Tau province in general.

Project name: Chau Duc Industrial Park

Location: Nghia Thanh commune, Suoi Nghe commune, Chau Duc district; Song Xoai commune, Chau Pha commune, Tan Thanh district, Ba Ria Vung Tau Province, Vietnam

Investor: Sonadezi Chau Duc Joint Stock Company

Scale: 1,556 hectares

Construction start time: 2007

Project operation time: Until 2058

Perspective of Chau Duc Industrial Park project

Perspective of Chau Duc Industrial Park project

Location of Chau Duc Industrial Park

Chau Duc Industrial Park is located in Chau Duc district and Tan Thanh district, Ba Ria Vung Tau Province, conveniently connected to main roads:

  • It only takes 13 km to Highway 51;
  • It only takes 6 km to Highway 56;
  • It only takes 40km to the City Expressway. Ho Chi Minh – Long Thanh;
  • It only takes 54km to the future Long Thanh international airport.
  • Thi Vai – Cai Mep deep sea port clusters: 16 km

Project location of Chau Duc Industrial Park

Project location of Chau Duc Industrial Park

Infrastructure of Chau Duc Industrial Park

Transportation System
  • Spindle system:
    • East – West Road: Road width 80m, 8 car lanes
    • North – South Road: Road width 54m, 6 car lanes
  • Internal transportation system:
    • Main road: 32m (4 car lanes)
    • Internal road: 29m (2 car lanes)

Internal road of Chau Duc Industrial Park

Internal road of Chau Duc Industrial Park

Electricity

National electricity system: 110KV, 22KV invested and exploited by Southern Electricity Corporation and Ba Ria Vung Tau Provincial Electricity. Backup generator system: Investors equip themselves depending on needs.

Chau Duc Industrial Park transformer station

Chau Duc Industrial Park transformer station

Water

Water volume (m3/day): The clean water supply plant’s capacity in phase I is 75,000 m³/day (in operation) and a maximum of about 150,000 m³/day in the future.

Chau Duc Industrial Park water supply plant

Chau Duc Industrial Park water supply plant

Wastewater treatment
Factory standards:
  • Invest in 03 centralized wastewater treatment stations with a total expected treatment capacity of about 45,000 m³/day.night
  • Wastewater to be treated: domestic wastewater and production wastewater
  • The volume of wastewater charged is equal to 80% of the volume of water supplied.
  • Maximum treatment capacity (m3/day): 45,000 m³/day.night
  • Current wastewater treatment capacity (m3/day): 500 m³/day.night.

Chau Duc Industrial Park wastewater treatment plant

Chau Duc Industrial Park wastewater treatment plant

Fire fighting system: 150m/ 1 fire hydrant.

Internet: invested by Ba Ria Vung Tau Telecommunications and providing services to customers.

Current status of land use planning in Minh Hung 3 Industrial Park

Updating

Priority areas to attract investment

  • Assembling and manufacturing electronic components, computers and semiconductors;
  • Telecommunication cables and materials;
  • Pharmaceuticals, medical equipment;
  • Precision mechanics, manufacturing air conditioners and washing machines;
  • Electrical equipment;
  • Automobile accessories, automobile manufacturing and assembly;
  • Industries producing new materials and nanotechnology;
  • Processing industries of gold, silver, gemstones, diamonds and precious metals.
  • Mechanical processing, steel structures;
  • Assembling bicycles, motorbikes, cars, and specialized means of transport;
  • Processing agricultural products, agricultural chemicals, food, beverages (not processing cassava starch);
  • Production of construction materials and components for the construction industry (excluding production of commercial concrete and concrete structures);
  • High-end fashion garments, leather shoes, textiles (excluding dyeing and tanning);
  • Production of plastic products, accessories, and household appliances;
  • Processing high-end products.

Other occupations not accepted and restricted in the Industrial Park:

  • Rubber latex processing industry;
  • Basic chemical production industry (with industrial wastewater generated);
  • Refine steel from scrap iron and steel using intermittent furnace technology;
  • Limited industries that attract and do not attract investment in Ba Ria Vung Tau province according to Directive 43-CT/TU dated August 6, 2014 of the Provincial Party Committee.

Investment incentive policies

  • Preferential corporate income tax of 17% for a period of ten years (10 years) (according to Decree No. 118/2015/ND-CP of the Government).
  • Exemption from corporate income tax for 2 years and 50% reduction of tax payable for the next 4 years (Clause 4, Article 19 of Circular No. 78/2014/TT-BTC dated June 18, 2014 of the Ministry of Finance).

Project planning map

Download high quality planning diagram file: Link

Evaluation of Chau Duc Industrial Park project

  • Chau Duc Industrial Park has a relatively convenient location with Hoi Bai – Chau Pha – Da Bac – Phuoc Tan road connecting directly from the Cai Mep deep-water port cluster to the Project and the main road connecting the Industrial Park to the project. Highway 56 in the South.
  • Chau Duc Industrial Park is built on an area with good geology, the ground load capacity ranges from 9.1 tons to 31.68 tons. Because of the hard ground, construction in Chau Duc Industrial Park saves a lot of costs on foundation treatment, while also being able to ensure projects using heavy-duty machinery.
  • Support customers in applying for Investment Registration Certificates, Business Registration Certificates, and completing procedures for applying for seals and tax codes; prepare an environmental impact assessment report; applying for construction permits, electricity and water connections, installing telephone, telecommunications, and Internet systems, and recruiting personnel (Sonadezi Chau Duc Joint Stock Company will accompany land lease customers throughout the implementation process. perform the above procedures, however, related costs will be paid by the customer).

Vietnam Property Hub service

With a staff of many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Việt Nam Property Hub offers the following services:

  • Investment promotion (land, factories) in industrial parks, industrial clusters and commercial and service land, …
  • Legal support & Investment consulting in fields related to industrial real estate.
  • Connecting industrial real estate investment cooperation.