Overview of Dau Giay Industrial Park project
Dau Giay Industrial Park is an industrial park established according to a modern model, including: Residential areas, entertainment centers and sports services. Formed in accordance with the development planning of Thong Nhat district in the general orientation of Dong Nai province. When put into operation, the project will create jobs for more than 20,000 local workers and attract workers from neighboring areas.
Project name: Dau Giay Industrial Park
Location: Dau Giay town, Thong Nhat district, Dong Nai province
Investor: Dau Giay Industrial Park Joint Stock Company
Scale: 328.3581 hectares
Construction start time: 2008
Project duration: Until 2058
Perspective of Dau Giay Industrial Park
Location of Dau Giay Industrial Park
Dau Giay Industrial Park is located at KM2, Provincial Road 769, Bau Ham 2 Commune & Xuan Thanh Commune, Thong Nhat District, Dong Nai Province. The project has a convenient location for both waterway and road traffic, located at the intersection of National Highway 1, National Highway 20, Provincial Road 769, and City Expressway. HCM – Long Thanh.
- To the north, adjacent to the North-South railway station, there is Dau Giay station and warehouse, convenient for the circulation of goods by rail to other places.
- The East borders Ho Chi Minh City – Long Thanh – Dau Giay – Da Lat highway
Location of Dau Giay Industrial Park on Google Map
Transportation connection from the industrial park is extremely convenient:
Road distance:
- Bien Hoa City: 38 km
- Ho Chi Minh City: 70 km
- Long Thanh: 32 km
* There is Ho Chi Minh City Expressway – Long Thanh International Airport located next to the East of Dau Giay Industrial Park, the time by car from Dau Giay to Ho Chi Minh City is only 50 minutes.
Distance to harbour:
- Dong Nai Port: 35 Km
- Binh Duong Port: 35 Km
- Phu My Port: 56 Km
- Thi Vai Port: 58 Km
- Go Dau Port: 47 Km
- Cat Lai Port: 60 Km
- Cai Mep Port: 65 Km
Railway: There is a project to build a railway station and warehouse in Dau Giay Industrial Park to facilitate the circulation of goods to different places.
Distance to airport:
- Long Thanh International Airport: 30 km
- Tan Son Nhat International Airport: 70 km
Infrastructure of Dau Giay Industrial Park
Road system:
- The main road is 15m wide, standard internal roads are 10m wide. With the ability to withstand H30 loads.
Infrastructure of Dau Giay Industrial Park project
Power system:
- Dau Giay 110KV power station supplies power from the 500KV North-South line, capacity of 63MW and 22KV power grid system serving the entire Industrial Park.
- Electricity price: according to the electricity price regulations of the State of Vietnam (served by Dong Nai Electricity Company)
Water supply system:
- Capacity: 10,000m3/day and night supplied from Gia Tan water plant.
Dau Giay Industrial Park water supply factory
Waste water treatment system:
- The industrial park is in the process of building a wastewater treatment plant.
- Wastewater treatment plant with capacity of 8,000 m3/day and night.
- Wastewater treatment: industrial wastewater and production wastewater.
- Emission standards from the industrial park: QCVN 40:2011/BTNMT (Meets class A standards).
- Wastewater volume: 80% of supply water volume.
Dau Giay Industrial Park wastewater treatment plant
Communication systems:
- Fully meets domestic and international communication needs.
Broadband internet master station with high-speed ADSL line.
Rainwater drainage system:
- Complete with a Ø 600 ~ 2000 pipe system installed underground along the roads, rainwater will be discharged directly to Bi stream, then to Dong Nai river. Discharge of any domestic or manufacturing wastewater or oil into the storm sewer system is not permitted.
Current status of land use planning in Dau Giay Industrial Park
Industrial Park planned land area: 328.3581 hectares
Land for factory construction: 211.20 hectares
Green land: 56.79 hectares
Service center land: 7.62 hectares
Land for warehouses and yards: 8.16 hectares
Technical infrastructure land: 4.47 hectares
Traffic land: 40.11 hectares
Unleased land area as of December 31, 2020: 20,1309 hectares
Priority areas to attract investment
- Mechanical engineering: Priority is given to manufacturing and assembling vehicles, and manufacturing machinery to serve the agricultural and industrial sectors.
- Electricity, electronics, information technology: Priority is given to the production of spare parts, electrical products, industrial electronics, telecommunications electronics, and information equipment.
- Pharmaceutical chemistry: Priority is given to the production of medicinal herbs, pharmaceuticals, medical instruments, cosmetics, flavors, and high-tech rubber.
- Textile and garment: Textile products, garments, embroidery and knitting, production of shoes and accessories for the shoe and textile industry.
- Consumer industry serving life: Sports equipment, children’s toys, jewelry, handicrafts, stationery items.
Investment incentive policies
Tax exemption for 02 years; 50% reduction for the next 04 years (Decree 218/2013/ND-CP)
Project planning map
Download high quality project planning diagram file: Link
Evaluation of Dau Giay Industrial Park project
- The province’s transportation system is invested in modernity such as road routes of Southeast Asian countries, highways connecting Ho Chi Minh City with Ba Ria – Vung Tau, Bien Hoa – Vung Tau railway system connecting the road network. Singapore – Kunming railway (China) has 50 km running through Dong Nai. This is also an important focal point for economic and social development, the development of the region’s industrial and commercial center and the convergence of important national transportation routes.
- Located in the sub-equatorial tropical monsoon region, less affected by natural disasters, there are two distinctly contrasting seasons: the dry season and the rainy season. The average cool air temperature is 25.4oC, the rainfall is relatively large > 1,800mm/year, which is an abundant source of water.
- Sharing the same infrastructure as the Southeast region, the ground is hard, has high compressive strength, and the bearing capacity of the ground is 1.7 kg/cm2. Minimize foundation construction costs for investors.
Vietnam Property Hub service
With a staff of many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Việt Nam Property Hub offers the following services:
- Investment promotion (land, factories) in industrial parks, industrial clusters and commercial and service land, …
- Legal support & Investment consulting in fields related to industrial real estate.
- Connecting industrial real estate investment cooperation.