Overview of My Xuan B1 Conac Industrial Park project

My Xuan B1 Conac Industrial Park was established on April 14, 1998 according to Decision No. 300/QD-TTg of the Prime Minister in My Xuan Ward, Phu My Town, Ba Ria Vung Tau Province with an area of planning of 211.92 hectares, of which the area of industrial land for rent is 160.41 hectares.

Project name: My Xuan Industrial Park B1 – Conac

Location: My Xuan Ward, Phu My Town, Ba Ria Vung Tau Province

Investor: IDICO Petroleum Construction Investment Joint Stock Company

Scale: 211.92 hectares

Construction start time: 1998

Project operation time: Until 2062

Perspective of the entrance gate of My Xuan B1 Conac Industrial Park project

Perspective of the entrance gate of My Xuan B1 Conac Industrial Park project

Location of My Xuan B1 Conac Industrial Park

My Xuan B1-CONAC Industrial Park is located in My Xuan ward, Phu My town, Ba Ria – Vung Tau province, located in the southern key economic region of Ho Chi Minh City – Binh Duong – Bien Hoa – Vung Tau. Convenient transportation by road, waterway and air.

Road: Located in the center of the southern key economic region including Ho Chi Minh City, Dong Nai, Binh Duong and Ba Ria Vung Tau province, very convenient for road transportation.

Waterway:

  • 7km from Go Dau Port;
  • 70km from Saigon port; Vung Tau Port 40km;
  • Phu My Port (Baria Serece) 9km; Thi Vai Port 5km;

Airline:

  • 70km from Tan Son Nhat airport;
  • 20km from Long Thanh international airport (planned for construction);

Vị trí Khu công nghiệp Mỹ Xuân B1 Conac

Location of My Xuan B1 Conac Industrial Park

Infrastructure of My Xuan B1 Conac Industrial Park

Electricity distribution system:

  • Provided by two national power sources 220/110KV Ba Ria – Long Binh and Phu My Thermal Power Plant through intermediate station 110/22KV 2×40 MVA.
  • Electricity price: According to the regulations of the State’s electricity price at the time of supplying  electricity to the factory in the Industrial Park.

Clean water supply system:

  • Clean water source is taken from Toc Tien water plant with a capacity of 40,000 m3/day and night

Waste water treatment system:

  • There is a common wastewater treatment plant for the entire industrial park, receiving industrial wastewater from the factory fence and sending it to the general wastewater treatment plant of the Industrial Park;
  • Phase 1 capacity: 1,000 m3/day and night.

My Xuan B1 Conac Industrial Park wastewater treatment plant ​

My Xuan B1 Conac Industrial Park wastewater treatment plant

Drainage system:

  • Includes: The rainwater drainage system and wastewater drainage system are planned and built separately, running along internal roads to ensure the collection of all rainwater and wastewater from factories in the industrial park.
  • Rainwater is drained directly into the receiving source.
  • Wastewater is collected at the centralized wastewater treatment station of the industrial park and thoroughly treated, meeting required standards before being discharged into the environment.

My Xuan B1 Conac rainwater drainage system

My Xuan B1 Conac rainwater drainage system

Communication systems:

  • Complete, ensuring easy domestic and international communication including telephone, mobile phone, Fax, Internet for investors;

Industrial air supply system:

  • Provided by CNG Vietnam Joint Stock Company.
  • The selling price is according to the market price at the time CNG Vietnam provided it to  investors.

Internal road system:

  • Asphalt road with load capacity H30.
  • Main routes 1A, 1B, 2A, 2B, 3, 3A: connecting to National Highway 51, Go Dau Industrial Park and My Xuan A2 Industrial Park, cross section 55m, road surface 15m wide.
  • The branch road has a cross section of 35m and a road surface of 8m wide.

Internal road of My Xuan B1 Conac Industrial ParkInternal road of My Xuan B1 Conac Industrial Park

Current status of land use planning in My Xuan B1 Conac Industrial Park

Currently, the industrial park has attracted 19 investment projects with a 100% occupancy rate.

Planning Map of My Xuan B1 Conac Industrial Park

Planning Map of My Xuan B1 Conac Industrial Park

Priority areas to attract investment

  • Construction materials industry;
  • Agricultural and forestry processing industry;
  • Mechanical manufacturing, repair and assembly industry;
  • Electronic and refrigeration assembly industry;
  • And some other industries do not cause serious pollution and toxicity…

Investment incentives

Corporate income tax

  • The current corporate income tax rate is 17%  (within 10 years from the date of taxable income).
    Tax exemption for 2 years and 50% reduction for the next 4 years from the date of taxable income.
  • The basis for applying corporate income tax incentives is applied according to the current legal regulations on corporate income tax and relevant guiding and adjusting documents.

Import tax: Enterprises are exempt from import tax for:

Goods imported to create fixed assets of subjects entitled to investment incentives according to the provisions of investment law, including:

  • Machinery, equipment, components, details, separate parts, spare parts for synchronous assembly or use with machinery and equipment; raw materials, supplies  used to manufacture machinery and equipment or to manufacture components, details, separate  parts, spare parts of machinery and equipment;
  • Specialized means of transport in the technological line used directly for the project’s production activities;
  • Construction materials cannot be produced domestically.

Projects in the list of special investment incentives:   Import tax exemption for a period of 5 years from the start of  production for raw materials, supplies and components that cannot be produced domestically.

Chính sách ưu đãi đầu tư Khu công nghiệp Mỹ Xuân B1 Conac

Incentive policies for investment in My Xuan B1 Conac Industrial Park

Planning map of My Xuan B1 Conac Industrial Park

Download high quality file of industrial park planning: Link

Evaluation of My Xuan B1 Conac Industrial Park project

  • The industrial park is located in the southern key economic region including Ho Chi Minh City, Dong Nai, Binh Duong, Ba Ria – Vung Tau. With the advantage of being located along National Highway 51, near modern infrastructure systems such as: Long Thanh international airport and deep-water seaport system (such as: Go Dau port, Thi Vai port, New Cai Mep port) .
  • In addition, My Xuan B1-CONAC Industrial Park is also located in the Phu My new urban area complex, which will be an ideal location for domestic and foreign investors looking for investment opportunities in Vietnam.

Vietnam Property Hub service

With a staff of many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Việt Nam Property Hub offers the following services:

  • Investment promotion (land, factories) in industrial parks, industrial clusters and commercial and service land, …
  • Legal support & Investment consulting in fields related to industrial real estate.
  • Connecting industrial real estate investment cooperation.

Contact for consultation

tu-van-dau-tu-bat-dong-san