Nam Tan Uyen Industrial Park is located in Khanh Binh ward, Tan Uyen town, Binh Duong province, is a key industrial cluster attracting investment in Binh Duong province, helping the province attract many domestic and foreign investors. come here from abroad.

Overview of Nam Tan Uyen Industrial Park project

Project name: Nam Tan Uyen Industrial Park

Location: Hamlet 4, Khanh Binh commune, Tan Uyen district, Binh Duong province;

Investor: Nam Tan Uyen Industrial Park Joint Stock Company

Scale: 331.97 hectares

Occupancy rate: 99.47%

Year of operation: 2005

Land use period: 2054

Location of Nam Tan Uyen Industrial Park

Nam Tan Uyen Industrial Park is located right on the road crossing DT 747B and DT 746 in Khanh Binh ward, Tan Uyen town, Binh Duong. Nam Tan Uyen Binh Duong Industrial Park has the advantage of being located right in the southern key economic center.

Project way:

  • Cat Lai port: 30 km;
  • ICD Song Than port: 16 km;
  • Thanh Phuoc River Port: 06 km;
  • About 32 km from Tan Son Nhat airport;
  • About 10 km from Highway 13;
  • About 28 km from Ho Chi Minh City;
  • Distance from Binh Duong New City: 06 Km

owns a convenient location

Infrastructure of Nam Tan Uyen Industrial Park

Technical infrastructure: Complete transportation infrastructure, closed transportation network with harmoniously designed routes to create beauty for the Industrial Park.There are facilities for workers’ housing and banks
Power supply system: Power system with 110/220KV source – 2×40 MVA (6 main lines + 2 backup lines)

Water supply and drainage system: Clean water plant with capacity of 33,000 cubic meters/day and night.

Wastewater and waste treatment system: Centralized wastewater treatment plant: Total design capacity 8,000 m3/day and night. Currently, the wastewater treatment plant has put module 1 into operation with a capacity of 2,000 m3/day and night.

Telecommunications and internet system: Telecommunications Center located in Industrial Park, 2600 connection ports with high-speed ADSL transmission system

Fire prevention and fighting system: Complete

Investment situation and infrastructure completion: Complete, flat ground.

Nam Tan Uyen Industrial Park wastewater treatment plant

Nam Tan Uyen Industrial Park wastewater treatment plant

Current status of land use planning

Nam Tan Uyen Industrial Park with a total area of 331.97 hectares.
In there:

  • Land for construction of industrial enterprises: 228.98 hectares
  • Land for operation and service center:  12.36 hectares
  • Main construction land:  3.43 hectares
  • Green land (isolated trees): 33.31 hectares
  • Traffic land:  53.89 hectares

Planning map of Nam Tan Uyen Industrial Park phase 1

Priority areas for attracting investment in Nam Tan Uyen Industrial Park

Mechanical project group: metallurgy, production of tools, parts, and replacement equipment; manufacturing equipment and machinery for agricultural and industrial production; manufacturing cars of all kinds and motorbikes of all kinds; processing and assembling special machinery and equipment; die casting, rolling and drawing of metal;

Food, beverage, and beverage processing project group: processing vegetables, tubers, fruits, grains, and agricultural products; processing of dairy products, livestock and poultry; seafood processing; catering industry; candies of all kinds; Fast food of all kinds, beer production, soft drinks, soft drinks of all kinds and pure drinking water,….

Project group on pharmaceuticals and cosmetics: cosmetic production; production of medicines for humans and livestock (including traditional and modern medicines); production and processing of biological products;

Project group on textile (not dyed) and garment: garment production, leather (not tanned), leatherette, textile products (not dyed);

Group of other projects: assembly of electronic products, printing, packaging and related services; production of handicrafts, wood processing and wood products; production of metal structures, barrels, tanks and boilers; manufacturing plastic, aluminum and high-end household items; production of paper goods and packaging from used pulp or paper; production of technological products; production of children’s toys,….

Preferential policies to attract investment in Nam Tan Uyen Industrial Park

  • Import tax and corporate tax rate apply at 21%
  • 100% tax exemption on imported goods such as: machinery – equipment; transportation vehicles and construction materials
  • Preferential export tax is 10% for the first 15 years and reduced by 50% for the next 9 years.

Planning map

Planning map

Planning map

Evaluation of Nam Tan Uyen Industrial Park project

Industrial Park has great advantages in infrastructure as well as external amenities. Very convenient for investing in projects with many attractive tax incentives.

Thanks to the advantage of a favorable geographical location, many industrial parks and supporting industrial clusters are being developed around Industrial park. Thanks to that advantage, it is easy to provide many of the best services for the investment quarter such as: preferential investment prices for infrastructure, low labor costs and easy transportation to neighboring provinces and cities,…

Panorama of Nam Tan Uyen Industrial Park

Services of Vietnam Property Hub

With a staff of many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Vietnam Property Hub offers the following services:

  • Investment promotion (land, factories) in industrial parks, industrial clusters and commercial and service land, …
  • Legal support & Investment consulting in fields related to industrial real estate.
  • Connecting industrial real estate investment cooperation.