Overview of Long Hau high-tech auxiliary factory project
Long Hau Da Nang High-Tech Support Factory is an investment support factory in Da Nang, invested and built by Long Hau Joint Stock Company in Da Nang High-Tech Park with the goal of supporting high-tech industries in Da Nang. This.
Total project scale is 29.6 hectares. Phase 1: 11.69 hectares Phase 2: 8.36 hectares Phase 3: 9.55 hectares Total investment capital is 1,050 billion VND. Project start year 2019. Factory type: Ready-built factory Factory built to order
Groundbreaking ceremony of Long Hau high-tech auxiliary factory in Da Nang
Location of Long Hau high-tech auxiliary factory project in Da Nang
Long Hau Da Nang factory has an extremely strategic location, located on the East – West economic corridor and easily moves through 13 provinces/cities of 3 countries: Laos, Thailand and Myanmar.
Located on the National Highway connecting North to South
It only takes 25 km to Tien Sa port
It only takes 5 km to Lien Chieu port
It only takes 17 km to Da Nang International Airport
It only takes 15 km to the City Center
Image of location of Long Hau High-tech Factory
The location of Long Hau high-tech factory is located in Da Nang high-tech park
Location of Long Hau high-tech factory planning
Infrastructure of Long Hau High-tech auxiliary factory in Da Nang
Traffic system
Traffic routes in the Hi-Tech Park include:
The Central Road has a cross section of Bn = 51m
The subdivision axes have a cross section of Bn = 22.5m ÷ 33m
Internal roads in each functional area have a cross section of Bn = 8m ÷ 15m.
Drainage system
Drainage in the High-Tech Park is designed according to separate drainage directions, specifically as follows:
Dirty drainage system: dirty water flows into the sewer system and is then cleaned at treatment plants before being discharged into the receiving source (river, lake, etc.).
Rainwater drainage system: has a sewer system and separate rainwater collection pits, delivered directly to the receiving source (river, lake…).
Sewerage system
Building a completely separate drainage system to drain wastewater for Da Nang high-tech park.
In the high-tech area, there are 2 key technical infrastructure works and a waste treatment station.
Station 1: mainly focuses on collecting and transferring solid waste, area: 0.8 hectares.
Station 2: investment in wastewater treatment plant, area: 02 hectares. Capacity: 18,000 m3/day.night (04 modules), ensuring thorough treatment of wastewater sources of the High-Tech Park to meet current environmental technical regulations QCVN 40:2011/BTNMT – Column B with systems numbers Kq=0.9 and Kf=0.9 before discharge
Water supply system
The water supply for the Hi-Tech Park is expected to be taken from Hoa Lien Water Plant with a capacity of 240,000 m3/day. Currently, the factory is in the investment preparation phase and will be completed in 2018.
Electricity distribution system
The power supply plan for the Hi-Tech Park is to build a 110/22kV Hoa Lien station, with a capacity of 2x63MVA. It is expected that 01 63MVA transformer will be put into operation in 2015. The dual-circuit 110kV line supplying power to the station will be transitionally connected to the 110kV Hoa Khanh – Hai Van Tunnel line circuit.
Communication systems
The high-tech park will have information and communication technology infrastructure to ensure smooth communication and connection, high quality transmission lines, security, safety and network security.
Infrastructure of Da Nang Hi-Tech Park is complete
Current status of planning for use of Long Hau High-Tech Auxiliary Factory
Currently, there are two Japanese companies, Hatsuta (location J04-01) and Inaba (location J04-02), renting at Lot J4. Long Hau is continuing to build 2 more factories at locations J4-03 (area 3,226 m2) and J04-04 (area 6,048 m2)
Floor plan of Lot J4 of Long Hau high-tech auxiliary factory
Long Hau high-tech auxiliary factory floor plan Lot J04-03&04
Priority areas to attract investment
Types of molds: High precision molds, high precision plastic molds;
High quality standard mechanical parts: High precision nuts, bolts, screws used for electronic devices, mechatronics, medical electronics, industrial robots;
All kinds of electronic masterpieces, household electronic circuits, audio-visual equipment, solar cells; types of processing chips, controllers (PLC programmable controllers, CNC controllers, …);
Component assemblies and spare parts for new and renewable energy twf power production equipment systems;
High quality plastic parts; Precision actuators, durable and long-lasting parts, heat-resistant and abrasion-resistant plastic;
Sensors of all types; Gas sensor, acceleration sensor, magnetic field sensor; biological sensors, temperature sensors, humidity sensors, light sensors, pressure sensors, …;
New generation motor types: Electric motors, magnetic drive motors, servo motors (stepper motors), reluctance motors, linear motors;
The actuators have high precision.
Types of molds: High precision molds, high precision plastic molds;
High quality standard mechanical parts: High precision nuts, bolts, screws used for electronic devices, mechatronics, medical electronics, industrial robots;
All kinds of electronic masterpieces, household electronic circuits, audio-visual equipment, solar cells; types of processing chips, controllers (PLC programmable controllers, CNC controllers, …);
Component assemblies and spare parts for new and renewable energy twf power production equipment systems;
High quality plastic parts; Precision actuators, durable and long-lasting parts, heat-resistant and abrasion-resistant plastic; Sensors of all types; Gas sensor, acceleration sensor, magnetic field sensor; biological sensors, temperature sensors, humidity sensors, light sensors, pressure sensors, …;
New generation motor types: Electric motors, magnetic drive motors, servo motors (stepper motors), reluctance motors, linear motors;
The actuators have high precision.Chính sách ưu đãi đầu tư
Investment incentives
Industries attracting investment: electronics, automobile component manufacturing, mechanical engineering and supporting industries for supporting industries (according to Decree No. 111/2015/ND-CP dated November 3, 2015)
Security: professional security team 24/7.
Surrounding amenities: factory area located in Da Nang high-tech park with full amenities such as commercial center, university, …
Connecting the business community: at Da Nang Hi-Tech Park and directly connected to the centralized information technology park
The project is designed with modern standards, solid structure, integrating many functions, meeting the production needs of the high-tech supporting industry.
Tax incentives
Tax incentives at Da Nang Hi-Tech Park – According to Decree 04/2018/ND-CP effective from February 20, 2018Corporate income tax incentives.
Images of tax incentives of Long Hau high-tech factory in Da Nang
Import tax incentives
Tax exemption for imported goods to create project fixed assets;
Tax exemption for imported goods used directly for scientific research and technological development activities;
Tax exemption for a period of 5 years from the date of production for raw materials, supplies and components that cannot be produced domestically.
Planning map of Long Hau high-tech auxiliary factory
Image of Long Hau high-tech factory floor plan
Image of the overall floor plan of the factory for rent in lot J4
Note: Minimum contract terms are 6 years (Rent price is fixed for the first 3 years for the factory lease contract, and increases by 10% for the next 3 years in the unit price of the factory lease contract.
Investment process
Step 1: Quotation & Proposal
Step 2: Sign the MOU reservation agreement (J4-3 + J4-4)
Step 3: Submit procedures to obtain approval for the high-tech industry from the competent authority
Step 4: Sign a reservation contract
Step 5: Legal procedures (investment certificate + business license)
Step 6: Construction (J4-3 + J4-4)
Step 7: Sign the rental contract
Step 8: Go live
Actual images of the completed factory at lot J4
Actual image of the factory viewed from above
Factory entrance gate
The campus outside the factory
Image of the factory exterior
Image of the office area inside the factory
Pictures inside the factory
Automatic fire protection system
Evaluation of Da Nang high-tech auxiliary factory
Advantage
Factory built with flexible area according to customer needs: from 1,500 m2, including complete office.
The approval procedure for supporting occupations is simple and quick.
Da Nang’s first factory for supporting technology.
Professional project management team with many years of experience.
Standard and modern equipment.
Completed infrastructure.
Defect
The factory is located in the heart of the city, so it has difficulty recruiting and transporting goods.
There is no factory available so customers who need a factory immediately will not be able to meet it.
The price is higher than the price of the area.
Vietnam Property Hub service
With a staff of many years of experience in the field of project investment implementation, with industrial park management boards, with project investors, serving many domestic and foreign investors, Việt Nam Property Hub offers the following services:
Investment promotion (land, factories) in industrial parks, industrial clusters and commercial and service land, …
Legal support & Investment consulting in fields related to industrial real estate.
Connecting industrial real estate investment cooperation.